Skip to content

🇯🇵 Tokyo | Equinix TY8 & TY sites · AT TOKYO CC1/CC2 · NTT

Remote Hands and Data Center Migration at Equinix TY8, Tokyo

From routine smart hands at TY8 to a full move from TY8 to CC1 — on call 24/7/365 as your hands in Tokyo.

Your hardware sits in Equinix TY8. Your engineers do not. Two Sheep is an independent remote hands provider in Tokyo: we go to the rack on your behalf for everyday work such as racking, cabling and part swaps, and for planned projects like the 100-server move we ran from TY8 to AT TOKYO CC1. We are available 24/7/365, coordinate in English, and send a quote within 1 business day.

100 servers

moved from TY8 to AT TOKYO CC1

24/7/365

dispatch and standby

1 business day

quote turnaround

What We Do at TY8 (24/7/365)

At Equinix TY8 and other Tokyo data centers, we handle the physical work your team cannot do from abroad: · Server and switch installation (rack and stack), including rails · Fiber and copper cabling, patching and labeling · Part replacement: disks, power supplies, memory · Power-on, reboots and status checks (LEDs, link-up, console access) · Receiving and unpacking, visual inspection and serial number logging · Decommissioning and removal of equipment We confirm the procedure and scope before every job and close it with a photo report. If you prefer, your engineer can direct the work live over a video call.

Case Study: 100 Servers Moved from Equinix TY8 to AT TOKYO CC1

Two Sheep moved 100 production servers for a client from Equinix TY8 to AT TOKYO CC1 in three phases: logistics first, pre-build, then the move. 1. Logistics: network switches stored in Hong Kong and Shanghai were cleared for export, shipped to Japan by international air freight and cleared through Japanese import customs, then delivered to CC1. 2. Pre-build: before the window opened, we installed racks, mounted switches, ran power and pre-configured the network at CC1, with standardized labeling and cable management. 3. Move and verification: inside the planned maintenance window, working with the client's engineers, we de-racked, transported and re-racked the servers, then checked each one against a migration checklist for connectivity, boot and traffic cutover. Result: all 100 servers moved within the planned maintenance window.

Shipping, Customs and Installation: One Point of Contact

If your hardware ships from abroad, Two Sheep arranges export and import customs clearance, international freight and delivery to the data center, then goes straight on to racking, cabling and power-on checks. You do not need to coordinate a freight forwarder, a customs broker and an on-site contractor separately. We have also delivered network hardware door to door to 29 sites in 16 countries across Latin America and the Caribbean, so cross-border rollouts are familiar ground.

Data Centers We Cover in Tokyo and Osaka

· Equinix: TY sites in Tokyo, including TY8, and OS sites in Osaka · AT TOKYO: CC1 and CC2 · NTT data centers · Other major data centers in Tokyo and Osaka (send us the facility name) To get us inside, you add our technicians to your facility access list or submit a work request with the data center. We walk you through the process before the first job.

How It Works

1. Tell us the facility (for example, Equinix TY8), the work and your preferred timing. 2. Get a quote within 1 business day. 3. Authorize our technicians with the data center. 4. We do the work following the agreed procedure, with a live video call if needed. 5. You receive a photo report of the results.

Frequently Asked Questions

Does anyone from our team need to be at Equinix TY8?

No. Once you authorize our technicians with Equinix, we access the facility on your behalf, follow its rules, and do the work. You review everything in a photo report.

Can you move our equipment from TY8 to another data center?

Yes. We moved 100 servers from TY8 to AT TOKYO CC1, covering the migration plan, de-racking, transport, re-racking, cabling and power-on verification. We propose a plan that fits your scale and schedule.

Can you respond at night or on holidays?

Yes. Dispatch and standby run 24/7/365. Time to arrival depends on the facility's access rules and whether your access authorization is already in place, so we confirm it for your specific site when you contact us.

Can you receive hardware shipped from abroad and handle customs?

Yes. We can arrange export and import customs clearance, international freight, delivery to the data center, receiving and unpacking. We have shipped network switches from Hong Kong and Shanghai into a Tokyo data center.

Is Two Sheep an official partner of Equinix or AT TOKYO?

No. Two Sheep is independent of the data center operators. We work on behalf of our customers and follow each facility's access rules. Names such as Equinix and AT TOKYO appear on this page only to identify the facilities where we work.

Can we communicate in English or Chinese?

Yes. Quotes and pre-job coordination are available in English, Chinese and Japanese. We handle all Japanese-language communication with the data center, and reports can be provided in English and Japanese.

Need Hands at TY8, or Planning a Move?

Tell us where your hardware is (for example, Equinix TY8 or AT TOKYO CC1) and what needs doing. You will have a quote within 1 business day, for a single job or a full migration.

Request a Quote

Company and facility names on this page are trademarks or registered trademarks of their respective owners. Two Sheep is not an official partner of any data center operator; we work independently on behalf of our customers.

Equinix TY8 Remote Hands & DC Migration (Tokyo) | Two Sheep